R&D Labs

Project Based Labs

Published by Tom Reynolds in Lean Laboratory, Lean R&D on October 14, 2019

Laboratories with project based workloads often have greater volatility in both the volume and mix of work than other lab types. The work content of later steps may only be clear after the preceding step is complete.  This all adds to an inherently unpredictable workload, both for the overall lab and for individual personnel. But there are some core strategies that you can deploy to make project labs more productive.

Applying Lean in Pharmaceutical R&D Labs

Published by Tom Reynolds in Lean R&D on April 11, 2018

Over the past few years, many of the leading Pharmaceutical companies have rolled out extensive programmes to the labs on their manufacturing sites.  The better programmes (i.e. those based on the key ‘Real Lean’ principles of levelling, flow and standard work and properly structured and supported) have achieved very impressive results. Pharmaceutical R&D labs however, are significantly different than the Product and Raw Material testing labs found in Pharmaceutical Manufacturing so can Real Lean work in R&D Labs?